
General

Site views: From 2m looking up the hill and from the far
side of 23cm looking downhill towards 2m.
23cm

Box of 4 55 element Tonnas under construction. John M0JFD, Julian G0LBO and
Peter G8HAV

Mast head amplifier/preamp for 23cm and the box of 4 ready to lift. Simon G8ATB
et al.

Yaesu FT735 with FT817 on top (Not for 23cm)
2m
2m mast being prepared for a first lift before the antennas are attached. Niall
G0VOK, Steve G0DQQ and David G4XUV are putting a curve into the mast.
Richard M1ESL and 'Jeff' G8SIG assemble on of the 17 element Tonnas.
The drop zone being cleared before Steve G0DQQ raises the mast. The load is
being taken by a block and tackle over the gin pole.
Graham GM4NGP and Niall G0VOK operate 2m.
4m
07:30 on Sunday morning Niall G0VOK prepares to raise the 4m antenna after
swapping it for the 6m one used on Saturday.
Station-in-a-box Mutek 57A transverter (4m and 6m) driven by Icom IC706 mk IIG

David G4XUV and John M0JFD operating 6m with grim determination.
Dave G4-CAX drinking beer with aplomb.
6m
Tim M0SIN assembling the 6m antenna being supervised by Margaret 2E1GDB and
hound.

6m antenna on mast ready to go aloft.
Tim M0SIN operating Yaesu FT100D on 6m.
The 6m Preamp sequencer (background) needed repairs; performed with this
soldering gun.
The last year of Psion logging. Julian G0LBO catches up with the 6m log.
Updated 01-Jan-2009 (G0LBO/G0GZI)